The slabs are prepped, inspected, and ready to be poured on lot 35 in Chinquapin.
The foundation walls are formed and ready to pour.
Pouring the footings for lot 35.
The basement cut is almost complete at lot 35. We will have to jackhammer that rock in the middle. That’s normal for construction in the mountains.
In mountainous construction, encountering rock formations during excavation is a common scenario. The use of a jackhammer or blasting to break down these rocks is a standard procedure to ensure the site is prepared for the next phase of construction.
Clearing and grading is almost complete on our new project.
New home started in Chinquapin. This will be a 6 bedroom home that is our Hickory plan with a full basement.
This home is on a 7 acre lot and will be a spec home that we will offer for sell later this year.